History and description The Ekaterinburg Arena, then still called Central Stadium, was built between 1953 and 1957. The stadium was initially a multi-sports arena, also hosting athletics and ice skating events. Central Stadium, with a capacity of 27,000, remained largely unchanged in the next decades until plans were made in the mid 2000s to extensively redevelop the stadium. Works started in 2007, and, after multiple delays, were completed in 2011, giving the stadium an extensive forex club ekaterinburg restaurants-over, but keeping the athletics track and sticking with a similar capacity as before.

Round the same time, Russia got awarded the 2018 World Cup, and soon after Yekaterinburg was shortlisted as one of the host cities for the tournament, which got confirmed in 2012. Unfortunately, the recently renovated Central Stadium did not meet FIFA standards, and thus new redevelopment plans had to be made. The protected external facade would have to be preserved, but otherwise the entire interior had to get rebuilt, boosting capacity to 45,000 seats. It took a long time for the project to be given the go ahead, even casting doubts on Yekaterinburg’s status as a host city, but building works eventually kicked off in the spring of 2015. The new and rebranded Ekaterinburg Arena reopened on 1 April 2018 with a league match between FC Ural and Rubin Kazan, though still at limited capacity of 20,000.

During the 2018 World Cup, the Ekaterinburg Arena will host four first round group games. After the World Cup, capacity will be reduced to 35,000 seats by removing the temporary seating behind both goals. How to get to the Ekaterinburg Arena The Ekaterinburg Arena is located in central Yekaterinburg just east of the city centre. The walk from the principal 1905 Square takes about 20 minutes. Yekaterinburg’s main train station, located a little north of the city centre, is somewhat further away from the Ekaterinburg Arena, just under 4 kilometres or a 45-minute walk.